Lean Six Sigma Certification Practice Question and Answers
1.
An improvement project team did a kano analysis
to prioritize the needs. As a next step should they focus on identifying delighters?
Yes or No
2.
The concepts used to reduce downtime caused by
changeover between jobs, machines or personnel are
COTR | Heijunka | Level Loading | SMED
3.
Lot size reduction technique aims at reducing
batch size to one
Yes
or No – Yes
4.
Who, What and how of the data to be collected
for improved process is found in
Communication Plan |
Response Plan | Monitoring Plan | Test Plan
5.
When in the process of trying to identify the
critical X’s for a lean project a PI lead creates a ____ because frequently it
is 20% of the inputs that have an 80% impact on the output.
ISHIKAWA Diagram | Pareto Chart
| Scatter Chart | Kano Model
6.
Creating assets and documenting best practices
is
Standard Work |
Heijunka | 5S | Kanban
7.
Kaikaku can also be known as
Kaizen
| Kaizen Blitz | Breakthrough Kaizen | All of the above
8.
Person(s) responsible for monitoring the process
is/are?
Senior Management | Team Lead
| People closest to Process | Managers
9.
In Lean manufacturing a production arrangement
of people, equipment, and materials where the processing steps are placed right
next to each other in sequential order is called a
Unit | Cell
| Shop floor
| Job shop
10.
In JIT, a minimum re-order level is set and only
once that mark is reached fresh stock are ordered
True or False
11.
If a car manufacturing company, introducing Lean
in it’s factory to reduce cycle time for new product launch, falls under which
type of Kaikaku:
Capital Intensive Locally Innovative
Operational Close Locally
Innovative
Capital Intensive Radically
Innovative
Operational Close
Radically Innovative
12.
Process Management Chart is a tool which helps
in prioritizing scatterats in a process improvement project
True or False
13.
It is a Lean manufacturing approach where a
single discrete unit of product flows from process to process
Lot size reduction
Level Balancing Heijunka
One-piece flow
Cellular manufacturing
14.
5S should be implemented by only one person per
department to save time and avoid confusion
True or False
15.
One Piece flow means
Batch | Larger lot sizes | One
piece moves to the next operation | Operators need to work harder
16.
Reduction of batch sizes cuts down the amount of
work in progress inventory ( WIP )
True or False
17.
Lean Technique which can be used to reduce
production support shift changeover time is
Level Loading | SMED
| Kanban | KAIKAKU
18.
Which of the following is considered an element
of value-added work ?
Doing the task or action right the first
time
Fixing a defect
Quality inspection
Preparation of test data
19.
The details of action to be taken when the
input, process, or output measures indicate an ‘out-of-control’ condition are
found in
Deployment flowchart
Charter
Response Plan
Data Analysis Plan
20.
On an average, BMS team that is monitoring ODC
access management gets 5000 mails weekly. Around 30% of these mails require no
action and clutter the inbox. Suggest which tool team can be used to improve
their productivity
QFD |
FMEA | 5S | Kano Analysis | Heijunka